Physical Infrastructure

Read the latest news and updates from the Open Compute Project.

Browse 217 news articles

  1. Cheval Group
  2. Cheval Group
  3. Cheval Group
  4. Cheval Group
  5. Cheval Group
  6. Cheval Group
  7. Cheval Group
  8. Cheval Group

    Cheval Group – Open Rack v3 (ORv3)

    The latest version of the Open Rack v3 combines OCP’s 21” / 0U with EIA-310E / RU standards to enable a wider range of applications. Using our experience in knock down designs, we have produced both…
  9. Murata

    Murata 21.6kW, 21” 1OU, Open Rack v3, Power Shelf (MWOCES-211-P-C)

    The Murata MWOCES-211-P-C is a 21.6kW, 21” 1OU power shelf that provides a delivery system for up to six 68mm, 1OU Power Supplies (PSU), and one Remote Management Unit (RMU). It is intended to support 50.5V/54.5V…
  10. Murata

    Murata Front-End Power Module (MWOCP68-3600-D-RM)

    MWOCP68-3600-D-RM is a highly-efficient 80PLUS® Titanium certified 3,600-Watt power factor corrected front-end power module that provides 54.5Vdc main and 12Vdc standby output. Active Current Sharing capability enables operation of multiple power modules within Murata’s Open Compute…