Resources
Welcome to the OCP Cold Plate Sub-Project. This Project is open to the public and we welcome all those who would like to be involved.
Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP’s Bylaws and IP Policy. This can be found on the OCP OCP Policies page. If you have any questions please contact OCP.
Cold Plate Important Links
– ACS Cold Plate Meeting Notes
Active Workstreams
| Workstreams | Workstream leads | Overview | Google Drive | Documents | |
|---|---|---|---|---|---|
| Coolant Fluids | Philip Yu (ChemTreat), Keegan Yaroch (DOW), Lilach Butchmits (Zutacore) | Guidelines for single & two phase coolant fluids: fluid spec, testing, material compatibility, etc. Coolant fluids include single-phase glycol-based, single-phase water-based, & two-phase. | Google Drive | Draft: Guideline for Using Water-Based Transfer Fluid in Single-phase Cold plate-based liquid-cooled racks (July 2024) Guidelines For Using Propylene Glycol-Based Heat Transfer Fluids In Liquid Cooled RacksPublished: Guidelines for Using Dielectric Liquid-Based Transfer Fluids in two-Phase Cold Plate-Based Liquid-Cooled Racks (July 2024) | |
| Cold Plate Performance | Thomas Rees (ToffeeX), Andrea Francescon (Corintis SA), Bharath Ram Ravi (Celestica) | Google Drive | |||
| UQD Specification v2.0 | Beth Langer (CPC), Travis Gaskill (Etched) | Universal Quick Disconnect (UQD) V2 Specification revision for both handmate and blindmate versions. The goal is to close the gaps with V1 (design, production, testing, etc.). | Google Drive | Draft: UQD v2.X.4 Spec Beta Draft | |
| BMQC (CLA) | Glenn Charest (Meta), Vijay Mohan (Meta) | ORv3 Blind Mate Quick Connector (BMQC) specification development. Currently testing to optimize hose lengths, routing, and hose guides for EPDM. | Google Drive | 2026_01_14_SUMMARY – BMQC EPDM Hose Evaluation.pdf 20250410_hose_clamp_snap_17_9mm.step | |
| PBMC (CLA) | Glenn Charest (Meta), Vijay Mohan (Meta), John Fernandes (Meta) | ORv3 Pivoting Blind Mate Coupling (PBMC). The goal is to develop a multi-sourced interoperable blind mate valve solution to support the higher flow rates needed for higher power systems. | Google Drive | PBMC CAD 8/12/25 PBMC Preliminary Design Basics rev4 9/26/25 PBMC Design Specification Draft Rev 0.5_121825 | |
| 1-Phase DTC Cold Plate Base Spec. V1 | Ben Sutton (CoolIT) | Single-Phase Direct-to-Chip Cold Plate Base Specification. The goal is to establish a vendor‑neutral, de‑facto industry baseline for single‑phase Direct‑to‑Chip (D2C) cold plates used in data center liquid cooling systems. | Google Drive | Single-Phase Direct-to-Chip Cold Plate Base Specification | |
| Fluid Velocity | Cosimo Pecchioli (bp), Cheng Chen (Meta), Harsha Bojja (Microsoft) | The goal is to perform an erosion test for higher fluid velocities. | Google Drive |
Accepted Contributions
All accepted contributions can be found in the OCP Contribution Database.
Highlighted Documents:
Cold Plate Requirements Workstream
– ACS Cold Plate Requirements Revision 1 – ACS Cold Plate Cooling Loop Requirements Revision 2
Fluid Serviceability and Maintenance Workstream
– Guidelines for Using Propylene Glycol-Based Heat Transfer Fluids in Single-Phase Cold Plate-Based Liquid Cooled Racks – Guidelines for Using Water-Based Transfer Fluids in Single-Phase Cold Plate-Based Liquid-Cooled Racks
Blind Mate Liquid Cooling for ORv3 (BMLC)
– ORV3 Blind Mate Quick Connector Specification (BMQC)
Universal Quick Disconnect
– Universal Quick Disconnect Hand-Mate Specification – Universal Quick Disconnect Blind-Mate Specification – Universal Quick Disconnect Blind-Mate Methodology Whitepaper
Regular Project Calls
Cold Plate
Every second Wednesday of the Month from 8am-9am PT
Call link
– Zoom Link to ACS Cold Plate Sub-project Calls – Meeting ID: 894 3907 7808 – Passcode: 273150
Find your local number: https://opencompute-org.zoom.us/u/kdxl9NR9DE
Cold Plate Coolant Liquids Workstream
Every other Monday from 7am-8am PT
Call link
– Zoom Link to Cold Plate Coolant Liquids Workstream Calls – Meeting ID: 881 5373 6938 – Passcode: 767739
Find your local number: https://opencompute-org.zoom.us/u/kdedcyUBct
UQD/UQDB Spec v2 Workstream
Every Thursday from 8am-9am PT
Call link
– Zoom Link to Cold Plate Coolant Liquids Workstream Calls – Meeting ID: 847 9294 0071 – Passcode: 568914
Find your local number: https://opencompute-org.zoom.us/u/kdedcyUBct
Call Recordings
Cold Plate calls
| Call Recordings |
|---|
| 2026 |
| 2025 |
| 2024 |
Coolant Fluids Workstream calls
UQD/UQDB Spec v2 Workstream calls
Archived Calls
Links to archived calls can be found here.
Regular Project Calls
Sub-project monthly calls occur:
Every second Wednesday of the month from 08:00-09:00am PT / 17:00-18:00 CET.
Sub-project workstream calls can be found on the calendar below. Workstream details are available on the wiki.
Call Calendar
These meeting are recorded via audio and video. By participating you consent that these recordings may be made publicly available. Any presentation materials, proposals and meeting minutes are published on the respective project’s wiki page and are open to the public in accordance to OCP’s Bylaws and IP Policy. This can be found at http://www.opencompute.org/about/ocp-policies/. If you have any questions please contact OCP.