Cooling Environments/Immersion: Difference between revisions

From OpenCompute
Jump to navigation Jump to search
(41 intermediate revisions by 3 users not shown)
Line 28: Line 28:


===Project Leadership===
===Project Leadership===
[[File:Immersion_Structure_Thumb.jpg|right|link=https://www.opencompute.org/w/images/4/49/Immersion_Structure_Large.jpg]]
 
''ACS Immersion Cooling Sub-project Leads''
''ACS Immersion Cooling Sub-project Leads''
:[mailto:rolf.brink@ocproject.net - Rolf Brink] (Promersion)
:[mailto:rolf.brink@ocproject.net - Rolf Brink] (Promersion)
Line 58: Line 58:
:- Nov 28, 2022: [https://www.opencompute.org/documents/material-compatibility-in-immersion-cooling-document-version-1-0-nov-28-2022-1-pdf Material Compatibility in Immersion Cooling]
:- Nov 28, 2022: [https://www.opencompute.org/documents/material-compatibility-in-immersion-cooling-document-version-1-0-nov-28-2022-1-pdf Material Compatibility in Immersion Cooling]
:- Dec 01, 2022: [https://www.opencompute.org/documents/ocp-base-specification-for-immersion-fluids-20221201-pdf OCP Base Specification for Immersion Fluids]
:- Dec 01, 2022: [https://www.opencompute.org/documents/ocp-base-specification-for-immersion-fluids-20221201-pdf OCP Base Specification for Immersion Fluids]
:- Aug 18, 2023: [https://www.opencompute.org/documents/ocp-acs-immersion-requirements-rev-2-1-pdf Immersion Requirements rev2.1]


==Immersion Requirements Qualification==
==Immersion Requirements Qualification==
The Immersion Requirements sub-project is responsible for the generation and qualification of requirements for immersion solutions. The requirements are aimed at ensuring accurate and factual technology positioning and weeding out marketing claims vs solid engineering. Vendors need to qualify against the requirements which are outlined in the [https://www.opencompute.org/documents/ocp-acs-immersion-requirements-rev-2-v1-00-pdf Immersion Requirements document] to gain access to a variety of OCP domains, including marketplace or SPEC recognition. Some examples are as follows:
The Immersion Requirements sub-project is responsible for the generation and qualification of requirements for immersion solutions. The requirements are aimed at ensuring accurate and factual technology positioning and weeding out marketing claims vs solid engineering. Vendors need to qualify against the requirements which are outlined in the [https://www.opencompute.org/documents/ocp-acs-immersion-requirements-rev-2-1-pdf Immersion Requirements document] to gain access to a variety of OCP domains, including marketplace or SPEC recognition. Some examples are as follows:
:- OCP immersion spec submission
:- OCP immersion spec submission
:- OCP Logo accreditation for immersion solutions (accepted/inspired)
:- OCP Logo accreditation for immersion solutions (accepted/inspired)
Line 68: Line 69:


The qualification process is as follows:
The qualification process is as follows:
:1- A qualification request with a filled-out [https://drive.google.com/u/0/uc?id=1-XnBAa8uDcvrPQkoEaxnBGHFysUln52z&export=download checklist] shall be sent to the Immersion Community project leads.
:1- A qualification request with a filled-out [https://drive.usercontent.google.com/download?id=13ejv0HUcunhBSFtJkMI3KcjENW4AxiYP&export=download checklist] shall be sent to the Immersion Community project leads.
:2- The Project leads will assess the submission and checklist and when accepted, schedule a 20-minute presentation for the submitter in the next available community call time slot.
:2- The Project leads will assess the submission and checklist and when accepted, schedule a 20-minute presentation for the submitter in the next available community call time slot.
::a- The presentation shall be made available to the project leads at the latest 1 week before the scheduled community call.
::a- The presentation shall be made available to the project leads at the latest 1 week before the scheduled community call.
Line 109: Line 110:
22:00-23:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/88631443691?pwd=L3Q0ckNDU1J6ZnAwQ3l3Wjl6cVlmdz09
[https://opencompute-org.zoom.us/j/88631443691?pwd=L3Q0ckNDU1J6ZnAwQ3l3Wjl6cVlmdz09 Zoom link]
||
||
[mailto:Rolf.Brink@ocproject.net - Rolf Brink](Promersion)<BR>
[mailto:Rolf.Brink@ocproject.net - Rolf Brink](Promersion)<BR>
Line 118: Line 119:
||
||
[https://ocp-all.groups.io/g/OCP-ACS-Immersion-Cooling Subscribe to the project mailinglist]<br>
[https://ocp-all.groups.io/g/OCP-ACS-Immersion-Cooling Subscribe to the project mailinglist]<br>
[mailto:Rolf.Brink@ocproject.net;%20John.Bean@ocproject.net?subject=Joining%20Monthly%20Community%20Calls&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-
|
|
Line 131: Line 131:
22:00-23:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/82804399864?pwd=VjJvcUNzUjJ3dXduZzlFUjdlclNQdz09
[https://opencompute-org.zoom.us/j/82804399864?pwd=VjJvcUNzUjJ3dXduZzlFUjdlclNQdz09 Zoom link]
||
||
[mailto:punith.shivaprasad@ocproject.net - Punith Shivaprasad](Shell)<BR>
[mailto:punith.shivaprasad@ocproject.net - Punith Shivaprasad](Shell)<BR>
Line 140: Line 140:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-Fluids-and-Materials Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-Fluids-and-Materials Subscribe to the workstream mailinglist]<br>
[mailto:Punith.Shivaprasad@ocproject.net;%20peter.cooper@ocproject.net?subject=Joining%20Fluids%20and%20Materials&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-
|
|
Line 153: Line 152:
23:00-00:00 CST
23:00-00:00 CST
||
||
https://opencompute-org.zoom.us/j/84225022419?pwd=T3VDdkRicENmWjZ6V1VEeFRBaUJ2Zz09
[https://opencompute-org.zoom.us/j/84225022419?pwd=T3VDdkRicENmWjZ6V1VEeFRBaUJ2Zz09 Zoom link]
||
||
[mailto:rolf.brink@ocproject.net - Rolf Brink] (Promersion)<BR>
[mailto:amy.short@ocproject.net - Amy Short] (Denvr Dataworks)<BR>
[mailto:rick.margerison@ocproject.net - Rick Margerison] (Rosseau Group)
[mailto:rick.margerison@ocproject.net - Rick Margerison] (Rosseau Group)
||
||
Line 164: Line 163:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-Requirements Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-Requirements Subscribe to the workstream mailinglist]<br>
[mailto:Rolf.Brink@ocproject.net;%20rick.margerison@ocproject.net?subject=Joining%20Immersion%20Requirements&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-
|
|
'''Immersion Cooling Hurdles'''
'''Immersion Cooling Challenges'''
||
||
'''[[Active]]'''
'''[[Active]]'''
Line 177: Line 175:
22:00-23:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/85076361852?pwd=OXV2TEZFV2dRb1NyZFFWdEdBL0VqUT09
[https://opencompute-org.zoom.us/j/85076361852?pwd=OXV2TEZFV2dRb1NyZFFWdEdBL0VqUT09 Zoom link]
||
||
[mailto:David.G@OCProject.net - David Gyulnazaryan] (Independent)<BR>
[mailto:Raul.Alvarez@OCProject.net - Raul Alvarez] (Independent)
[mailto:Raul.Alvarez@OCProject.net - Raul Alvarez] (Independent)
||
||
Line 185: Line 182:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-Hurdles Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-Hurdles Subscribe to the workstream mailinglist]<br>
[mailto:David.G@ocproject.net;%20Raul.Alvarez@ocproject.net?subject=Joining%20Immersion%20Hurdles&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-


Line 199: Line 195:
22:00-23:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/81173541240?pwd=WVMrRGxVRnFtVnJlei84ME1oWk9wUT09
[https://opencompute-org.zoom.us/j/81173541240?pwd=WVMrRGxVRnFtVnJlei84ME1oWk9wUT09 Zoom link]
||
||
[mailto:oriol.chavanel@ocproject.net - Oriol Chavanel] (Submer)<BR>
[mailto:oriol.chavanel@ocproject.net - Oriol Chavanel] (Submer)<BR>
Line 208: Line 204:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-Power-Distribution Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-Power-Distribution Subscribe to the workstream mailinglist]<br>
[mailto:Oriol.Chavanel@ocproject.net;%20Kevin.Gero@ocproject.net?subject=Joining%20Power%20Distribution%20in%20Immersion&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]


|-
|-
Line 223: Line 218:
22:00-23:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/82871827247?pwd=bFRsVWxHdTZiS1hVL1ZUZWFleC9XZz09
[https://opencompute-org.zoom.us/j/82871827247?pwd=bFRsVWxHdTZiS1hVL1ZUZWFleC9XZz09 Zoom link]
||
||
[mailto:Mick.Jones@OCProject.net - Mick Jones] (Vertiv)
[mailto:Mick.Jones@OCProject.net - Mick Jones] (Vertiv)
Line 230: Line 225:
||
||
[https://ocp-all.groups.io/g/OCP-HWmgt-Liquid-Cooling Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/OCP-HWmgt-Liquid-Cooling Subscribe to the workstream mailinglist]<br>
[mailto:Mick.Jones@ocproject.net;%20?subject=Joining%20Hardware%20Management%20for%20Liquid%20Cooling&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-


Line 244: Line 238:
23:00-00:00 CST
23:00-00:00 CST
||
||
https://opencompute-org.zoom.us/j/89122397904?pwd=dlR2d3ExNEd1cERRMVJLZVk5S0QyQT09
[https://opencompute-org.zoom.us/j/89122397904?pwd=dlR2d3ExNEd1cERRMVJLZVk5S0QyQT09 Zoom link]
||
||
[mailto:Kai.Wang@ocproject.net - Kai Wang] (Intel)<BR>
[mailto:Kai.Wang@ocproject.net - Kai Wang] (Intel)<BR>
Line 253: Line 247:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-SI Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-SI Subscribe to the workstream mailinglist]<br>
[mailto:Andy.Young@ocproject.net;%20Kai.Wang@ocproject.net?subject=Joining%20Signal%20Integrity&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-


Line 261: Line 254:
'''[[Active]]'''
'''[[Active]]'''
||
||
4th Wednesday
2nd and 4th Wednesday
||
||
8:00-9:00am PT<BR>
7:00-8:00am PT<BR>
17:00-18:00 CET<BR>
16:00-17:00 CET<BR>
23:00-00:00 CST
22:00-23:00 CST
||
||
https://opencompute-org.zoom.us/j/89733044690?pwd=S0xzb1hLRzFiMHVzN2x1bm0wVEo1QT09
[https://opencompute-org.zoom.us/j/89733044690?pwd=S0xzb1hLRzFiMHVzN2x1bm0wVEo1QT09 Zoom link]
||
||
[mailto:Allison.Boen@ocproject.net - Allison Boen] (Independent)<BR>
[mailto:Allison.Boen@ocproject.net - Allison Boen] (Independent)<BR>
Line 275: Line 268:
||
||
[https://ocp-all.groups.io/g/CE-Immersion-TCO Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-TCO Subscribe to the workstream mailinglist]<br>
[mailto:Eduard.Roytman@ocproject.net;%20Allison.Boen@ocproject.net?subject=Joining%20TCO%20modelling&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]
|-
|-


Line 283: Line 275:
'''[[Active]]'''
'''[[Active]]'''
||
||
2nd Monday
1st Wednesday
||
||
8:00-9:00am PT<BR>
8:00-9:00am PT<BR>
Line 289: Line 281:
23:00-00:00 CST
23:00-00:00 CST
||
||
https://opencompute-org.zoom.us/j/82757015804?pwd=eVp1VDdMVTJsMFhjQXZZaGdWMkdmQT09
[https://opencompute-org.zoom.us/j/82757015804?pwd=eVp1VDdMVTJsMFhjQXZZaGdWMkdmQT09 Zoom link]
||
||
[mailto:Rich.Lappenbusch@ocproject.net - Rich Lappenbusch] (SuperMicro)<BR>
[mailto:Rich.Lappenbusch@ocproject.net - Rich Lappenbusch] (SuperMicro)
[mailto:Michael.Cordle@ocproject.net - Michael Cordle] (Seagate)
||
||
[https://docs.google.com/document/d/1ErbEfvZUiCG0NYithJR11tDFyCqBWjcrEr1J7vGwImI/edit?usp=sharing Workstream definition]
[https://docs.google.com/document/d/1ErbEfvZUiCG0NYithJR11tDFyCqBWjcrEr1J7vGwImI/edit?usp=sharing Workstream definition]
||
||
[https://ocp-all.groups.io/g/CE-Immersion-Warranty Subscribe to the workstream mailinglist]<br>
[https://ocp-all.groups.io/g/CE-Immersion-Warranty Subscribe to the workstream mailinglist]<br>
[mailto:Mchael.Cordle@ocproject.net;%20Rich.Lappenbusch@ocproject.net?subject=Joining%20Warranty%20for%20Immersed%20IT&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request direct invitations]


|-
|-
|
|
'''OAI collaboration'''
'''Immersion Fluid Lifecycle Management'''
||
||
'''[[Active]]'''
'''[[Active]]'''
||
||
4th Wednesday
3rd Wednesday
||
||
7:00-8:00am PT<BR>
7:00-8:00am PT<BR>
16:00-17:00 CET<BR>
16:00-17:00 CET<BR>
22:00-23:00 CST
22:00-23:00 CST
||
[https://opencompute-org.zoom.us/j/82541266696?pwd=czFGVGFUVnd4RHhCRHhEanNOVkdPUT09 Zoom link]
||
[mailto:Kris.Fletcher@ocproject.net - Kris Fletcher] (BP)<BR>
[mailto:Brandon.Marshall@ocproject.net - Brandon Marshall] (Chemours)
||
[https://docs.google.com/document/d/16eZ1RDSibmoz8ORrekjGoDiqFFEYG0Ob Workstream definition]
||
[https://ocp-all.groups.io/g/CE-Immersion-Fluid-Lifecycle Subscribe to the workstream mailinglist]<br>
|-
|
'''OAI collaboration'''
||
'''[[Active]]'''
||
4th Wednesday
||
8:00-8:30am PT<BR>
17:00-17:30 CET<BR>
23:00-23:30 CST
||
||
Invitation only
Invitation only
Line 318: Line 330:
||
||
[mailto:Rolf.Brink@ocproject.net;%20ChengChen@meta.com?subject=Joining%20OAI%20Collaboration&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request to join]
[mailto:Rolf.Brink@ocproject.net;%20ChengChen@meta.com?subject=Joining%20OAI%20Collaboration&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request to join]
|-
|-
|
'''Immersion Component Validation'''
||
'''[[Active]]'''
||
TBD
||
TBD
||
Invitation only
||
[mailto:Peter.Liu@ocproject.net - Peter Liu] (FormericaOE)
||
||
[mailto:Peter.Liu@ocproject.net?subject=Joining%20Component%20Validation&body=Hi,%20I%20would%20like%20to%20join%20this%20community.%20Can%20you%20please%20add%20me%20to%20your%20invitations? Request to join]


 
|-
|
|
'''Design Guidelines for Immersion-Cooled IT Equipment'''
'''Design Guidelines for Immersion-Cooled IT Equipment'''
Line 348: Line 376:
|+ Calls overview
|+ Calls overview
|-
|-
!Month/year!!Community calls!!Fluids and Materials!!Hardware Management!!Power Distribution!!Immersion Hurdles!!Immersion Requirements!!TCO Modelling!!Warranty Guidelines!!Signal Integrity
!Month/year!!Community calls!!Fluids and Materials!!Hardware Management!!Power Distribution!!Immersion Hurdles!!Immersion Requirements!!TCO Modelling!!Warranty Guidelines!!Signal Integrity!!Fluid Lifecycle
|-
|-
<!-- COPY THE FOLLOWING LINES TO ADD A MONTH TO THE TABLE tag -->
<!-- COPY THE FOLLOWING LINES TO ADD A MONTH TO THE TABLE tag -->
Line 361: Line 389:
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Fluid Lifecycle call links below this line, separate multiple links with "<BR>" tag -->
|-
|Feb 2024
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=_URt84DtC-4 Feb 14th, 2024]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Fluid Lifecycle call links below this line, separate multiple links with "<BR>" tag -->
|-
|Jan, 2024
||<!-- Community call links below this line, separate multiple links with "<BR>" tag --> [https://opencompute-org.zoom.us/rec/share/CYvkwhwlCiFKPNHphJ7dvJvhWelvMU8WFcEgpKQY8sOwGSkhVSmDWqz3pvP6MVlW.6kOhuH-k1bVAhsUE?startTime=1705417503000 Jan 16th, 2024]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/play/qeNIBPfZ9juITZcu5WLryZq0GVpCL4IMxIREAH5R02QYah-7Ww_Np6aAlVHJ0vvwr2abTzx5bKG-FQw1.bO7qkc02o_FCfnO5?canPlayFromShare=true&from=recording_mg&continueMode=true&pwd=YGN3TrtAPnowr6cT-TbUPrXNHSJ55fhE&componentName=rec-play&originRequestUrl=https%3A%2F%2Fopencompute-org.zoom.us%2Frec%2Fshare%2F3SdlixVfSkfIopTT7zuhVxNh4iAFkHlcZzpFztfv0aw9_7wrVbbPim9q3UFNkQwZ.Zcu3DWaTr26zzUOw%3Fpwd%3DYGN3TrtAPnowr6cT-TbUPrXNHSJ55fhE Jan 17th, 2024]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/play/Y984JpaCehKFCUG3aVLwVujDhvnGnrW_0dZX_mgz4lXA49NQAV61moTl7O8w3gtn7Ogso3ouZ3VTYqZa.cXQ2SOvoToG6F0yZ?canPlayFromShare=true&from=recording_mg&continueMode=true&pwd=y69QleCmsuFENJabpKSSCFnZ_zQMm-UC&componentName=rec-play&originRequestUrl=https%3A%2F%2Fopencompute-org.zoom.us%2Frec%2Fshare%2Fku9GfS_OIOPr6-LzoRIKTBtDOpxTL9175OPcoFWW8Fa5ouwrWKwtXzoGq0RhUr55.CLTPG-lgNHPYCTf4%3Fpwd%3Dy69QleCmsuFENJabpKSSCFnZ_zQMm-UC Jan 17th, 2024]
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/play/JGQSI-91fdbGHrj_tU5Ma8NiCUVoEAWTU_OLNrs2tNbWonIQYwRa5X1FOgCXY3eCtvcdsazLDBBTQ3pv.kWmE6ns-49zs-95_?canPlayFromShare=true&from=recording_mg&continueMode=true&pwd=M2pzEhjc7Nsecs79wP7lIRqZTjbmONxa&componentName=rec-play&originRequestUrl=https%3A%2F%2Fopencompute-org.zoom.us%2Frec%2Fshare%2FkNCMeMT2tRfQoCOhEaNrk4AGRixLeA31iJidfzXxC4iAgec_p5123-mhR_Pf4j9G.vafM2oDQY_W6tw5H%3Fpwd%3DM2pzEhjc7Nsecs79wP7lIRqZTjbmONxa&autoplay=true&startTime=1705507553000 Jan 17th, 2024]
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/play/eJc48OIncIOv0LWG-tuBc0uU_DyfqtpET7td17R7U6spQC7I5hyFkUGFdVgFDPkI2QpBJw8qkcIaTLFU._7NslMrnOpJ0-qQS?canPlayFromShare=true&from=my_recording&continueMode=true&pwd=w8WknbXXVSSU4CYldqJrLBPfictpGPGZ&componentName=rec-play&originRequestUrl=https%3A%2F%2Fopencompute-org.zoom.us%2Frec%2Fshare%2FwStHz4DwHUkToB7K6cReu-iAImqoi_I1PURRZJv-aI4cRJRwL0LNaJH9iZvIo023.rjeoEr6fLidJWMsn%3Fpwd%3Dw8WknbXXVSSU4CYldqJrLBPfictpGPGZ Jan 15th, 2024]
||<!-- Fluid Lifecycle call links below this line, separate multiple links with "<BR>" tag -->
|-
|Dec, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/Z0H6QC3S0NVZXnllGwMxe_tCPbpMsa1Ud9APmIGZTo5sdF6bAmlv0wD-JmMtgyYc.eqiZwZaOwn2MfN9s?startTime=1702998358000 Dec 19th, 2023]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/hjCNh4aDdyoBq-_XAoxfc0BSKlRVED9N3aeI66pUI9zq-6fYw9ZtrCmODGUly7y9.ea7kwcYmMaDLjzjL Dec 6th, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/XD1Go34i2JD3Ai-9I2TvbUEBLXNril-tccGtA7OC-viWS0DPz5aGa2gpGK-unVNr.wMgF_USjeAqeGVEg Dec 4th, 2023]
|-
|Nov, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/IGYu_eqbOXNbdShrWQzfMCzREcclr91w1Y1zTu8ipeBxuKpVGPwwTKs2-I3TPVwn.C3O8_EQFU3JxQQvR?startTime=1700579067000 Nov 21st, 2023]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/fdkh9122uZ2wet7Tg4QtAVJa0F2-KYKOXlRk8Y4R3qcbqRU1DViswQTXg1j_Fzwa.IF0LnQqKwI_X8jro Nov 28th, 2023]
<BR>
[https://opencompute-org.zoom.us/rec/share/wD94yXrJQaxd8fV2zFMuwjS3sSOROW9bNy846Jvcx8zfgyTpsSrIqd9igZI8eUj8.dJQi8tsglJTzOIUI Nov 14th, 2023]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/9WTvWxvRpW8MLFqeCdXpcBcOrs1nyriYYuvJGWPQxDzO7AeEdUjLSXQ7sQO_4cRV.ZvEwaDvNwdjXQnfc Nov 1st, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/Z31U0XVaHT4pZBasruKwuRHz8dMp9v_UzSTx5V3zScP8qLgz4Uq7wwy5Am4OBp0t.QQgFUHjYbD-acFKN?startTime=1699368963000&pwd=PzthVxgsmoh04GnYuQDkNk3LPB-SNDHo Nov 7th, 2023]
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/JoEiBJgjJljMGOPSTKPsqq9d5X_wQaLcG7eg6AbxL9vo52-aZMP7ofzw86YPW4rv._n8qOuRsDFSrATXh Nov 15th, 2023]
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/bcnbStrGSdx1cjOrgtfChCcXL67pILazSIaBMGBA2GrF9EpoVRNwq8tJtNnvZ6rK.mglNc2w2wMQ13DB9 Nov 8th, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/B7Na7DD6O0WyJXD4qORxLZ8X0mzGPKopiN4e4FmLVFH4iTU325fCE9XIZ1xYYMcw.e2NC2QhefqKP6zBE Nov 20th, 2023]
<BR>
[https://opencompute-org.zoom.us/rec/share/UMTYpyjUQshoKDmOa0fvmjwP9Mxbm6iWYwKLoGaxUUwdHPeY0junBjkbhb3xngHH.zXw9femNaeEx1unj Nov 6th, 2023]
|-
|Oct, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/Mwce2WVg72AaqkuX5RPxrdBpArJZ7kVe7hRmg1rg1pNEb2amto33IWpILqoqInH5.9Uaw3Hjhtw5XNRrj Oct 25th, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/djU5HdB_5bAJ5_oMjtnI3N__f4Ls96-TVGBRUqwSaPlg4mlCGSw2XCpK3a_StcAf.4CHFyry6HLaivR36 Oct 23rd, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/ZrXhjg-2MeOtNn3u4TVVuyPMI5o_U6rqQplrYUABVBuhdGW6snN5N6DohGRL5ygr.sjDYSZIDfHZOWW4W Oct 10th, 2023]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/PnSMQYDCc0ilBiFx93QUi8KNENFTa5Wz1gXZwwdBTZ-ynpKdPm_8R4aD0UynMzU-.BodD0TZ_TDmBAn1Z Oct 18th, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/E8-XN5oB758WHg2sVn7STQsvVJdW06hdS9bJYkUn2GFAkId_Nuho0Q7I5qnMvt7m.EDJKVy9yGP5XSv5g Oct 4th, 2023]
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/unAPAZ116NzGBbQ4RdW1Z8NHgw2sH8Hxzp6T7UD4qeFIypgEIx26fJXTytcPQ9oD.Yc8gBVmgCP1UY6Vz Oct 11th, 2023]
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/ahcXsGn4p2kNq12ataSWQS_YcJy1Gsneiy-KDM7RkQStO2A32lCErJH9VknBkz5q.JhvKdT_qNZeIxoHU Oct 25th, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/wKqaS6MnqHPy0fej9cqGwhLSKQ7rs4hcsiSyddquUGdnFYJ96gc5UAtdkkDC4PA.PRPqTzPGUnZDYK2v Oct 11th, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/rRHIjT_Y4A7YzEGF4v6Unk37NCiEnWomHCJgxIpOJB0QChHVhY-Tjn8x2RmOMQR_.iE6oyWv7qB07DBsW Oct 23rd, 2023]
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/usgP8ULkCh1N9XDTnMFZON31lBTja_O8oDsupBz7s2ri2N2qt5K2M-3jV60S3Pue.HdBBrlLWSCDWy6We Oct 2nd, 2023]
|-
|Sep, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/czFfy632PwAInpFBbu6IP5at609_7JByYYYwZClII7fkFatXNHQ342Ku89VxSpmf.wfkNA9APtQkt0jrj?startTime=1695132285000 Sep 19th, 2023]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/THO8ie1wUFeaYpRjdZfO7cQDmHjiQeGaQLCe0lOELseyr_ekMURYVlV0PAogjbHH.t5Np5b9qxK_HKd3t Sept 14th, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/5rCsLrvC2I7UbHHnp_6tLZf8xAtnt8MzvrIWLC-0yyE0cHD0wyyJY1v4HudwVjVq.gcTafxP2oll0bWQa Sept 13th, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/pi9QYJFOfXOQP3M_MFZeEZyivBIq9HqjNeMtLZ9Mb6XWx7TevffX_grv1BDSNe17.Fdbye8jmP8lqd6Us Sept 12th, 2023]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/KlftNdsYCiwVE49xRNYEvA0ay6tB4b6m89GPbDHKjS3hw1E_WihyJflfuBFwWIwo.fN2yoXiWfz_zlVfn Sept 6th, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/Tdsa_Pit9hn7U_ksHa-cvY4q9DQ29vwYDIyk1QqjNYKmgWxUZZvj_dZxLAFW0VvH.ys894-7iKVu1tEUt Sept 13th, 2023]
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/vvQe9GkIZYF8B4Sot_UTDYDfM7sVkLK8_7p1JDpsttwHAysTAhaT91wC7TRhRF8.n6AwI0VIDCYeBl5z Sept 13th, 2023] <BR>
[https://opencompute-org.zoom.us/rec/share/ih_UfcYfxZKXeS4n0NHBnVH9xHpC45HmhdNdY5dN1YkNES_As5P9A5tbj6NRTmWw.1k67bsWle-hPyoQm Sept 6th, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/ZGMTiT8Tk5LjcxX2VPhbLAKkXRUxxb8rCkbDxkPndHk-bvoFUo0LNtFLvsdMyg76.OB-PLTUNwmesecOC Sept 8th, 2023]
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://opencompute-org.zoom.us/rec/share/xYH8CTDbc0H72OIhuL6tDPS5TOimavQQBq5ILYQ_LbsW27mt9X65HeFREsG2Gkb9._tX2_KhfG9XzP-Yu Sept 4th, 2023]
|-
|Aug, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=GDKDPqsUhF4 Aug 15, 2023]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=dAGuowBuVvk Aug 15, 2023]
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=9nMIGCrmL9g Aug 9, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=vQjIUA-2lDs Aug 14, 2023]
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
|-
|Jul, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=A_0J1wJT2aA Jul 18, 2023]
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=Zm9DyjMeJWk July 11, 2023]<br>
[https://www.youtube.com/watch?v=A_0J1wJT2aA Jul 25, 2023]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=CHcNCMroGXo Jul 19, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=ZEvGTGEDUiI July 11, 2023]
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=0mWgZcJowFo Jul 12, 2023]
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=L51VKgHED1U Jul 19, 2023]
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=SoJTFnXCAj0 Jul 26, 2023] <BR> [https://www.youtube.com/watch?v=PYTVLwJwXeQ Jul 12, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=bOJ991bA8nQ Jul 24, 2023]<br>[https://www.youtube.com/watch?v=CXP1f8WGwyQ July 10, 2023]
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=BVZS_eFLRXQ Jul 17, 2023]
|-
|Jun, 2023
||<!-- Community call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=ZakfvVWHFBE June 20, 2023]<br>
||<!-- Fluids and Materials call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=TP2-Uxog48w June 27, 2023]<br>[https://www.youtube.com/watch?v=y84h6zZP5dc June 13, 2023]
||<!-- Hardware Management call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=LQaPMsgT53c June 21, 2023]<br> [https://www.youtube.com/watch?v=Z8OvM8lyNN8 June 7, 2023]
||<!-- Power Distribution call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=xaONQ-ip1AY June 6, 2023]
||<!-- Immersion Hurdles call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=ylGfL8SZx-k June 14, 2023]
||<!-- Immersion Requirements call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=xyFMSjNf1Ek June 21, 2023]
||<!-- TCO Modelling call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=Vnasb9Phfh0 June 28, 2023]<br>
[https://www.youtube.com/watch?v=R1YCTisZKV0 June 14, 2023]
||<!-- Warranty Guidelines call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=TtUmP0l9dq0 June 12, 2023]
||<!-- Signal Integrity call links below this line, separate multiple links with "<BR>" tag -->
[https://www.youtube.com/watch?v=dMLrPpLAG3c June 5, 2023]
|-
|-



Revision as of 01:51, 15 February 2024

OCP-Open-advanced-cooling-solutions-3x-v1-34.png

Call for Papers: Share Your Insights on Immersion Cooling

The OCP Immersion Project is inviting industry experts and enthusiasts to share their knowledge and insights on immersion cooling during our community calls. Every two months, one of our community calls will be dedicated to presentations from the industry.

We encourage submissions that are non-commercial and are aligned with the objectives of the OCP Immersion Project. Presentations may cover a range of topics, including but not limited to use cases, case studies, technology developments, best practices, industry trends, and any other content relevant to the global immersion industry or the OCP Immersion Project.

How to Submit

To submit your presentation for consideration, please complete our submission form, which can be accessed at the following link:

- Submission Form

Please upload your presentation within the submission form. Make sure your presentation uses the OCP Immersion project template, which can be downloaded from here:

- OCP Immersion Project Template

The OCP Immersion Project Leadership will review submissions and select presentations for inclusion in the community call. We appreciate your contribution to the immersion cooling community.

Please note that all presentation materials, proposals, meeting minutes, and/or supporting documents submitted will be open to the public in accordance with OCP's Bylaws and IP Policy.

Welcome

Welcome to the OCP Immersion Cooling Sub-project to the Cooling Environments Project.

This Project is open to the public and we welcome all those who would like to be involved.

Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP's Bylaws and IP Policy. This can be found on the OCP OCP Policies page. If you have any questions please contact OCP.

Project Leadership

ACS Immersion Cooling Sub-project Leads

- Rolf Brink (Promersion)
- John Bean (GRC)

For Cooling Envitonment Project leadership, please refer to the Cooling Environments Wiki page

- Cooling Environments Wiki

Workstream leadership

There are various workstreams within the immersion project with their own respective workstream leaderships. An overview can be found under Immersion Project and Workstreams
See the orgchart on the right side (click to enlarge) for the full overview of all workstreams and responsibilities within the immersion project.

Activities

The Immersion sub-project enables community driven activities focused on facilitating OCP and industry progression of immersion cooling. Within the Cooling Environments (CE) group, this project also facilitates harmonization among other sub-projects and various other industry platforms.

Related documentation

Additions or changes to put on the agenda of different focus groups can be included in the "Suggested Changes" document.

- Change and update suggestion document
- OCP Presentation Template - please contact the project leadership for a copy

Accepted contributions

- Mar 06, 2019: Asperitas Fan Sim Specification
- May 20, 2019: ACS Immersion Community Requirements White Paper
- Feb 27, 2020: Asperitas Open Cassette Specification
- Feb 27, 2020: Asperitas Open Cassette design file
- Dec 18, 2020: Design Guidelines for Immersion Cooled IT equipment Whitepaper
- Jan 21, 2022: Immersion Requirements rev2
- Nov 28, 2022: Material Compatibility in Immersion Cooling
- Dec 01, 2022: OCP Base Specification for Immersion Fluids
- Aug 18, 2023: Immersion Requirements rev2.1

Immersion Requirements Qualification

The Immersion Requirements sub-project is responsible for the generation and qualification of requirements for immersion solutions. The requirements are aimed at ensuring accurate and factual technology positioning and weeding out marketing claims vs solid engineering. Vendors need to qualify against the requirements which are outlined in the Immersion Requirements document to gain access to a variety of OCP domains, including marketplace or SPEC recognition. Some examples are as follows:

- OCP immersion spec submission
- OCP Logo accreditation for immersion solutions (accepted/inspired)
- OCP solution branding
- OCP Marketplace positioning
- OCP Solution building

The qualification process is as follows:

1- A qualification request with a filled-out checklist shall be sent to the Immersion Community project leads.
2- The Project leads will assess the submission and checklist and when accepted, schedule a 20-minute presentation for the submitter in the next available community call time slot.
a- The presentation shall be made available to the project leads at the latest 1 week before the scheduled community call.
b- The presentation shall explain why and how the submitted solution qualifies against this Immersion Requirements document.
3- A 60-minute interactive review will be scheduled by a community committee:
a- The committee is overseen by one of the immersion project leads.
b- The committee will consist of the Immersion Requirements authors which are invited by the project leads.
c- All materials (checklist, community presentation, community questions and other collateral) are shared with the reviewers at least 1 week before the review meeting.
i- There will be 1 week to review materials, request additional feedback and ask follow-up questions after the review session;
ii- There will be 1 additional week to allow for all votes to be cast;
iii The committee will approve, decline or provide feedback to resolve before approval, based on the Immersion Requirements.
4- The community committee is formed as follows:
a- All authors of the Immersion Requirements document are invited to be panelists;
b- One of the immersion project leads oversees the qualification process and panel;
c- Each company represented in the panel counts as 1 vote (excluding the qualifying company);
d- A quorum is achieved with a minimum of 5 votes present in the panel.

Immersion Project and Workstreams

How to get involved

- Send a message to the workstream leaders by following the provided link (Join thi project or workstream) and;
- Sign-up to the mailing list for the project or workstream:
- The project mailing list is used to distribute project call meeting invitations and to communicate announcements on project status, meeting schedules, and agendas.
- The workstream mailing lists are used to distribute workstream call invitations and to actively discuss topics with all workstream members.

Project schedule overview

Note: All calls are scheduled and maintained in US Pacific time zone and follow US/Pacific DST schedules.
Project/workstream Status Monthly schedule Timeslot Meeting link Points of contact Related documents How to join

Project Community call

Main Project Call

3rd Tuesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Rolf Brink(Promersion)
- John Bean (GRC)

Main project page
Main Project Wiki page

Subscribe to the project mailinglist

Fluids and Materials

Active

2nd & 4th Tuesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Punith Shivaprasad(Shell)
- Peter Cooper(Submer)

OCP Immersion Fluid Base Specification
Material Compatibility in Immersion Cooling whitepaper

Subscribe to the workstream mailinglist

Immersion Requirements

Active

3rd Wednesday

8:00-9:00am PT
17:00-18:00 CET
23:00-00:00 CST

Zoom link

- Amy Short (Denvr Dataworks)
- Rick Margerison (Rosseau Group)

Immersion Requirements rev2 (PDF)
Immersion Requirements rev2 (DOCX)
Immersion qualification checklist (XLSX)
Immersion Requirements rev1 (PDF) - Legacy

Subscribe to the workstream mailinglist

Immersion Cooling Challenges

Active

2nd Wednesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Raul Alvarez (Independent)

Workstream definition

Subscribe to the workstream mailinglist

Power Distribution in Immersion

Active

1st Tuesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Oriol Chavanel (Submer)
- Kevin Gero (Murata)

Workstream definition
Design Requirements Document

Subscribe to the workstream mailinglist

Hardware Management for Liquid Cooling

Active

1st and 3rd Wednesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Mick Jones (Vertiv)

Workstream definition

Subscribe to the workstream mailinglist

Signal Integrity

Active

1st Monday

8:00-9:00am PT
17:00-18:00 CET
23:00-00:00 CST

Zoom link

- Kai Wang (Intel)
- Andy Young (Asperitas)

Workstream definition
Workstream sessions

Subscribe to the workstream mailinglist

TCO Modelling for Immersion

Active

2nd and 4th Wednesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Allison Boen (Independent)
- Eduard Roytman (Intel)

Workstream definition

Subscribe to the workstream mailinglist

Warranty Guidelines for Immersion Cooled IT equipment

Active

1st Wednesday

8:00-9:00am PT
17:00-18:00 CET
23:00-00:00 CST

Zoom link

- Rich Lappenbusch (SuperMicro)

Workstream definition

Subscribe to the workstream mailinglist

Immersion Fluid Lifecycle Management

Active

3rd Wednesday

7:00-8:00am PT
16:00-17:00 CET
22:00-23:00 CST

Zoom link

- Kris Fletcher (BP)
- Brandon Marshall (Chemours)

Workstream definition

Subscribe to the workstream mailinglist

OAI collaboration

Active

4th Wednesday

8:00-8:30am PT
17:00-17:30 CET
23:00-23:30 CST

Invitation only

- Rolf Brink (Promersion)
- Cheng Chen (Meta)

Request to join

Immersion Component Validation

Active

TBD

TBD

Invitation only

- Peter Liu (FormericaOE)

Request to join

Design Guidelines for Immersion-Cooled IT Equipment

Inactive

N/A

N/A

N/A

- Rolf Brink (Promersion)

Design Guidelines for Immersion-Cooled IT Equipment

Previous meetings

Recordings From Past Calls

Community presentations
All community debrief presentations can be found here

Calls overview
Month/year Community calls Fluids and Materials Hardware Management Power Distribution Immersion Hurdles Immersion Requirements TCO Modelling Warranty Guidelines Signal Integrity Fluid Lifecycle
Feb 2024

Feb 14th, 2024

Jan, 2024 Jan 16th, 2024

Jan 17th, 2024

Jan 17th, 2024

Jan 17th, 2024

Jan 15th, 2024

Dec, 2023

Dec 19th, 2023

Dec 6th, 2023

Dec 4th, 2023

Nov, 2023

Nov 21st, 2023

Nov 28th, 2023
Nov 14th, 2023

Nov 1st, 2023

Nov 7th, 2023

Nov 15th, 2023

Nov 8th, 2023

Nov 20th, 2023
Nov 6th, 2023

Oct, 2023

Oct 25th, 2023
Oct 23rd, 2023
Oct 10th, 2023

Oct 18th, 2023

Oct 4th, 2023

Oct 11th, 2023

Oct 25th, 2023
Oct 11th, 2023

Oct 23rd, 2023

Oct 2nd, 2023

Sep, 2023

Sep 19th, 2023

Sept 14th, 2023
Sept 13th, 2023
Sept 12th, 2023

Sept 6th, 2023

Sept 13th, 2023

Sept 13th, 2023
Sept 6th, 2023

Sept 8th, 2023

Sept 4th, 2023

Aug, 2023

Aug 15, 2023

Aug 15, 2023

Aug 9, 2023

Aug 14, 2023

Jul, 2023

Jul 18, 2023

July 11, 2023
Jul 25, 2023

Jul 19, 2023

July 11, 2023

Jul 12, 2023

Jul 19, 2023

Jul 26, 2023
Jul 12, 2023

Jul 24, 2023
July 10, 2023

Jul 17, 2023

Jun, 2023

June 20, 2023

June 27, 2023
June 13, 2023

June 21, 2023
June 7, 2023

June 6, 2023

June 14, 2023

June 21, 2023

June 28, 2023
June 14, 2023

June 12, 2023

June 5, 2023

May, 2023

May 16, 2023

May 3rd, 2023
May 17th, 2023

May 2nd, 2023

May 10th, 2023

May 17, 2023

May 10, 2023

May 8, 2023

May 1st, 2023

Apr, 2023

April 25th, 2023

April 5th, 2023

April 4th, 2023

April 12, 2023

April 26, 2023

April 26th, 2023
April 12, 2023

April 24, 2023

April 3rd, 2023

Mar, 2023

March 21st, 2023

March 28th, 2023
March 14th, 2023

March 1st, 2023

March 7th, 2023

March 8th, 2023

March 15th, 2023

March 22nd, 2023

March 13th, 2023

March 6th, 2023

Feb, 2023

February 28th, 2023
February 14th, 2023

Feb 1, 2023

Feb 7, 2023

Feb 8, 2023

February 22nd, 2023

Feb 13, 2023

Feb 6, 2023

Jan, 2023

Jan 17, 2023

Jan 10, 2023
Jan 24, 2023

Jan 18, 2023

Jan 3, 2023

Jan 11, 2023

Jan 18, 2023

Jan 25, 2023

Jan 5, 2023

Dec, 2022

December 20th, 2022

December 13th, 2022

December 7th, 2022

December 6th, 2022

December 14th, 2022

December 21st, 2022
December 19th, 2022

Nov, 2022

November 15th, 2022

November 22nd, 2022
November 9th, 2022
November 8th, 2022

November 16th, 2022
November 2nd, 2022

November 23rd, 2022
November 9th, 2022

November 30th, 2022

Oct, 2022

October 4th, 2022

October 26th, 2022
October 12th, 2022

Sep, 2022

September 20th, 2022

September 21st, 2022
September 7th, 2022

September 6th, 2022

September 28th, 2022
September 14th, 2022

September 21st, 2022

Aug, 2022

August 16th, 2022

August 9th, 2022

August 17th, 2022
August 3rd, 2022

August 24th, 2022
August 10th, 2022

August 17th, 2022

Jul, 2022

July 2021st, 2022

July 6th, 2022

July 5th, 2022

July 27th, 2022
July 13th, 2022

Jun, 2022

June 21st, 2022

June 15th, 2022
June 1st, 2022

June 22nd, 2022

May, 2022

May 17th, 2022

May 18th, 2022
May 4th, 2022

Apr, 2022

April 19th, 2022

April 20th, 2022
April 6th, 2022

April 5th, 2022

Mar, 2022

March 15th, 2022

March 22nd, 2022
March 8th, 2022

Feb, 2022

February 8th, 2022

Jan, 2022

January 18th, 2022

January 25th, 2022

Dec, 2021

December 21st, 2022

Nov, 2021

November 16th, 2021

November 23rd, 2021

Okt, 2021

October 19th, 2022

October 12th, 2021

Sep, 2021

September 21st, 2021

September 28th, 2021
September 14th, 2021

Aug, 2021

August 18th, 2021

August 24th, 2021
August 10th, 2021

Jul, 2021

July 20th, 2021

July 14th, 2021

Jun, 2021

June 29th, 2021
June 15th, 2021

May, 2021

May 18th, 2021

Apr, 2021

April 20th, 2021

Historic work sessions

Legacy calls overview
Month/year Various work sessions
Jan, 2021

January 19th, 2021

Oct, 2020

October 20th, 2020

Sep, 2020

September 15th, 2020

Aug, 2020

August 18th, 2020

Jul, 2020

July 21st, 2020
July 16th, 2020

Jun, 2020

June 17th, 2020

May, 2020

May 19th, 2020

Apr, 2020

April 21st, 2020

Mar, 2020

March 23rd, 2020

Feb, 2020

February 18th, 2020

Nov, 2019

November 21st, 2019
November 19th, 2019

Oct, 2019

October 15th, 2019

Aug, 2019

August 20th, 2019

Jul, 2019

July 23rd, 2019

Jun, 2019

June 25th, 2019

June 11th, 2019

May, 2019

May 28th, 2019
May 14th, 2019

Apr. 2019

April 30th, 2019
April 16th, 2019
April 2nd, 2019

mar, 2019

March 5th, 2019

Feb, 2019

February 19th, 2019
February 5th, 2019

Jan, 2019

January 22nd, 2019
January 8th, 2019

Dec, 2018

December 11th, 2018

Nov 2018

November 27th, 2018
November 13th, 2018

Oct, 2018

October 30th, 2018
October 16th, 2018