Editing Data Center Facility/OCP Ready
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 83: | Line 83: | ||
:- V2.2 - 2019/01/17 - Added rolling and concentrated load Acceptable level of 4.5kN. | :- V2.2 - 2019/01/17 - Added rolling and concentrated load Acceptable level of 4.5kN. | ||
:- V2.3 - 2019/06/18 - Corrected issue in Self Assessment Status rollup for Site 2 and Site 3 assessments. | :- V2.3 - 2019/06/18 - Corrected issue in Self Assessment Status rollup for Site 2 and Site 3 assessments. | ||
:- V2.4- 2019/02/05 - Added clarification to those requirements that must have an 'Optimum' or 'Acceptable' result and for 'Considerations' information only. Added to Considerations > Efficiency > the 'Site Operations'attribute. | :- V2.4 - 2019/02/05- Added clarification to those requirements that must have an 'Optimum' or 'Acceptable' result and for 'Considerations' information only. Added to Considerations > Efficiency > the 'Site Operations'attribute. | ||
:- V2020 - 2020/02/12 - Final for publication | :- V2020 - 2020/02/12 - Final for publication | ||
:- V2020A - 2020/10/08 - Final for publication | :- V2020A - 2020/10/08 - Final for publication |