Editing Data Center Facility/OCP Ready
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 59: | Line 59: | ||
==Revisions== | ==Revisions== | ||
:- [https://docs.google.com/forms/d/e/ | :- [https://docs.google.com/forms/d/e/1FAIpQLSfHvryfaV8sYsAXQ4MJ1z1B7Goi7OLXg0lCywVOL2o8OTSqQA/viewform?usp=sf_link Change Proposal Form] | ||
:- [https://docs.google.com/spreadsheets/d/ | :- [https://docs.google.com/spreadsheets/d/1Yb4BpJ-cIm-vLIDtIwan43uQ80v_KjVMqS_bTWzl5ok/view?usp=sharing Change Proposal Ledger] | ||
=== Revision History === | === Revision History === | ||
<!--Insert revisions and updates here. Format: Revision - YYYY/MM/DD - Description--> | <!--Insert revisions and updates here. Format: Revision - YYYY/MM/DD - Description--> | ||
Line 88: | Line 88: | ||
:- V2020A V2.5 - 2021/7/1 - Revision to allow for air containment and aisle widths to be selected as 'Not Applicable' due to RDHx deployment | :- V2020A V2.5 - 2021/7/1 - Revision to allow for air containment and aisle widths to be selected as 'Not Applicable' due to RDHx deployment | ||
:- V2020A V2.6 - 2023/1/17 - Revision to the 'Checklist' worksheet for the revised approval process and minor edits 1) Added 'IT Technical Space' to 'White Space' headings to align with OCP Ready Requirements Matrix -2020A 2) Added note to 'Checklist' worksheet cell B28 & B29 'not required for re-assessment,refers to rows 22-23' | :- V2020A V2.6 - 2023/1/17 - Revision to the 'Checklist' worksheet for the revised approval process and minor edits 1) Added 'IT Technical Space' to 'White Space' headings to align with OCP Ready Requirements Matrix -2020A 2) Added note to 'Checklist' worksheet cell B28 & B29 'not required for re-assessment,refers to rows 22-23' | ||
== Recordings from Past Calls == | == Recordings from Past Calls == |