Editing Cooling Environments/Immersion
Jump to navigation
Jump to search
The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 61: | Line 61: | ||
==Immersion Requirements Qualification== | ==Immersion Requirements Qualification== | ||
The Immersion Requirements sub-project is responsible for the generation and qualification of requirements for immersion solutions. The requirements are aimed at ensuring accurate and factual technology positioning and weeding out marketing claims vs solid engineering. Vendors need to qualify against the requirements which are outlined in the [https://www.opencompute.org/documents/ocp-acs-immersion-requirements-rev-2- | The Immersion Requirements sub-project is responsible for the generation and qualification of requirements for immersion solutions. The requirements are aimed at ensuring accurate and factual technology positioning and weeding out marketing claims vs solid engineering. Vendors need to qualify against the requirements which are outlined in the [https://www.opencompute.org/documents/ocp-acs-immersion-requirements-rev-2-v1-00-pdf Immersion Requirements document] to gain access to a variety of OCP domains, including marketplace or SPEC recognition. Some examples are as follows: | ||
:- OCP immersion spec submission | :- OCP immersion spec submission | ||
:- OCP Logo accreditation for immersion solutions (accepted/inspired) | :- OCP Logo accreditation for immersion solutions (accepted/inspired) | ||
Line 69: | Line 69: | ||
The qualification process is as follows: | The qualification process is as follows: | ||
:1- A qualification request with a filled-out [https://drive | :1- A qualification request with a filled-out [https://drive.google.com/u/0/uc?id=1-XnBAa8uDcvrPQkoEaxnBGHFysUln52z&export=download checklist] shall be sent to the Immersion Community project leads. | ||
:2- The Project leads will assess the submission and checklist and when accepted, schedule a 20-minute presentation for the submitter in the next available community call time slot. | :2- The Project leads will assess the submission and checklist and when accepted, schedule a 20-minute presentation for the submitter in the next available community call time slot. | ||
::a- The presentation shall be made available to the project leads at the latest 1 week before the scheduled community call. | ::a- The presentation shall be made available to the project leads at the latest 1 week before the scheduled community call. |