Editing Cooling Environments/ACF Advanced Cooling Facilities

Jump to navigation Jump to search
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.

The edit can be undone. Please check the comparison below to verify that this is what you want to do, and then publish the changes below to finish undoing the edit.

Latest revision Your text
Line 15: Line 15:


==== Sub-project Leads ====
==== Sub-project Leads ====
:- [mailto:john.menoche@ocproject.net John Menoche](Vertiv)
:- [mailto:John.gross@ocproject.net John Gross] (J. M. Gross Engineering, LLC), [mailto:john.menoche@ocproject.net John Menoche] (Vertiv)
:- [mailto:saket.karajgikar@ocproject.net Saket Karajgikar](Meta)
:- [mailto:charles.freda@ocproject.net Charles Freda](GF Piping Systems)


== Current Workstreams ==
== Current Workstreams ==
Line 25: Line 23:
:- [https://docs.google.com/document/d/1h7dv_bP3Yc7ASUARkNXxz6P557mS3s6Ame8GH3vhfFw/edit?usp=sharing Data Center Liquid Distribution Guidance & Reference Designs]  OCP Guidance, Reference Designs – Adding Liquid Cooling loops to Data Centers. All are welcome to comment.
:- [https://docs.google.com/document/d/1h7dv_bP3Yc7ASUARkNXxz6P557mS3s6Ame8GH3vhfFw/edit?usp=sharing Data Center Liquid Distribution Guidance & Reference Designs]  OCP Guidance, Reference Designs – Adding Liquid Cooling loops to Data Centers. All are welcome to comment.


:- BIM Standards
:- BIM Standards - All are welcome to comment.


:- CDU 'from scratch' paper
:- Physical Parameters Survey - All are welcome to comment.
::> [https://lh3.google.com/u/0/d/1NgCinwCllLp6RccEJV8NfpW591nh4vJVALf9gtD8NE0=w212-h159-p-iv1  Immersion Product Parameter Template]Immersion Product Parameter Template link placeholder
::> RDHx Product Parameter link placeholder


==Documents==
==Documents==
Line 52: Line 52:


Please join the  meeting from your computer, tablet or smartphone.
Please join the  meeting from your computer, tablet or smartphone.
https://global.gotomeeting.com/join/948388005


https://opencompute-org.zoom.us/j/81081031118?pwd=T1h3RjlmR0czREJmemQ2VGRGS0NTQT09
You can also dial in using your phone.
United States (Toll Free): 1 866 899 4679
United States: +1 (571) 317-3116


Join Zoom Meeting
'''Access Code: 948-388-005''' <br>
https://opencompute-org.zoom.us/j/81081031118?pwd=T1h3RjlmR0czREJmemQ2VGRGS0NTQT09
 
 
'''For alternate numbers and/or if you are new to GoToMeeting?''' <br> Get the app now and be ready when your first meeting starts:
https://global.gotomeeting.com/install/948388005.


Meeting ID: 810 8103 1118
Passcode: 408346


If there is a cancellation, we will try our best to cancel >24hrs before the meeting by the calendars above.
If there is a cancellation, we will try our best to cancel >24hrs before the meeting by the calendars above.
Line 66: Line 70:


==Recordings & Notes from Past Calls==
==Recordings & Notes from Past Calls==
=2023=
:- [https://www.youtube.com/watch?v=v4IcaChtLR0 August 1, 2023]
:- [https://www.youtube.com/watch?v=OFQ5HbfuhWY July 18, 2023]
:- [https://www.youtube.com/watch?v=CAuYxKkhJa4 July 11, 2023]
:- [https://www.youtube.com/watch?v=zjgyIuBzb4g June 13, 2023]
:- [https://www.youtube.com/watch?v=waQ_CX3_ILU June 6, 2023]
:- [https://www.youtube.com/watch?v=WT9JF_X-p5k May 23, 2023]
:- [https://www.youtube.com/watch?v=TXO7Nkx7n50 May 16, 2023]
:- [https://www.youtube.com/watch?v=_IA4Qx7dbyM May 9, 2023]
:- [https://www.youtube.com/watch?v=Y21WCjylQ0s May 2, 2023]
:- [https://www.youtube.com/watch?v=3cj5sNcAKNk April 25, 2023]
:- [https://www.youtube.com/watch?v=xwZBoGx34ls April 4, 2023]
:- [https://www.youtube.com/watch?v=TMNAYWzNmE4 March 28, 2023]
:- [https://www.youtube.com/watch?v=ypYwKNGBTj8 March 21, 2023]
:- [https://www.youtube.com/watch?v=_B-cPhTM6zQ March 14, 2023]
:- [https://www.youtube.com/watch?v=Nh_trz-ynS4 March 7, 2023]
:- [https://www.youtube.com/watch?v=t-oZbvxVcjo Feb 21, 2023]
:- [https://www.youtube.com/watch?v=iO99U-O9a1I Feb 16, 2023]
:- [https://www.youtube.com/watch?v=mcRBULu9dq0 Jan 31, 2023]
:- [https://www.youtube.com/watch?v=aa-1lvtf-dU Jan 24, 2023]
:- [https://www.youtube.com/watch?v=RGqHJo4LZOc Jan 10, 2023]


=2022=
=2022=
:- [https://www.youtube.com/watch?v=98Gj7Gq8xa4 November 8th, 2022]
:- Recording, [https://drive.google.com/drive/folders/1aj4XLy_1kIKGw0vz_cM4lBq41pVGf_c0?usp=sharing Notes]
:- [https://www.youtube.com/watch?v=SAaQ4Wf-NMA October 11th, 2022]
:- September, 13, 2022 Recording, [https://docs.google.com/document/d/18WA2jQix71yE3oOZN1DauPeHn1kaaPv3u6zSg7gPa_I/edit?usp=sharing Notes]
:- [https://www.youtube.com/watch?v=JoXxnC5UPPA August 16th, 2022] 
:- [https://www.youtube.com/watch?v=qN_JOnzCpK0 July 19th, 2022]   
:- [https://www.youtube.com/watch?v=qN_JOnzCpK0 July 19th, 2022]   
:- [https://www.youtube.com/watch?v=ZvkMp0oc1rI July 7th, 2022]  ACF APAC Call
:- [https://www.youtube.com/watch?v=ZvkMp0oc1rI July 7th, 2022]  ACF APAC Call
Line 175: Line 154:
:- [https://www.youtube.com/watch?v=jgDw4eZ8haY August 25th, 2020]
:- [https://www.youtube.com/watch?v=jgDw4eZ8haY August 25th, 2020]
:- [https://www.youtube.com/watch?v=gZW67QoP27k August 18th, 2020]
:- [https://www.youtube.com/watch?v=gZW67QoP27k August 18th, 2020]
:- [https://www.youtube.com/watch?v=joG8p9CLpZs August 11th, 2020 Recording] & [https://docs.google.com/document/d/1yH45qtBagxq_8jXlMRE84krfiqgYiwKtHRAFKGai62k/edit?usp=sharing Notes]
:- [https://www.youtube.com/watch?v=joG8p9CLpZs August 11th, 2020]
:- [https://www.youtube.com/watch?v=JYxEOZRdaxg August 4th, 2020]
:- [https://www.youtube.com/watch?v=JYxEOZRdaxg August 4th, 2020]
==Notes from Past Calls==
Meeting Highlights, 8/11/20
- Review of Mission –
o Boundary of solution – ACF current boundary focus is solution development for connection of Advanced cooling solutions to Data Center faciltiies [and beyond].  Primarily water/glycol solutions connecting to facilities water system (FWS) or condenser water. 
 Action item – Develop a clearer technical description – John Bean, Julius Neudorfer leading this effort
- Problems to Solve – What are the key problems ACF is seeking to address
o Lack of standardization on facilities side of ACS solutions leads – unique solutions = unique problems.  OCP history has been to reduce challenges, cost by advancing standardization and simplification
o Perception issues preventing adoption of liquid cooling – complexity, cost, risk
o Adaptability/Scalability – ability to add/expand liquid cooling footprint requires planning
 Action item  Create tracking list of problems for ACF to address (Thank you Austin) https://docs.google.com/spreadsheets/d/1fnN755fuveLHEcqX_01EMsxoIwVi8iW4vccCES2fJ9A/edit?usp=sharing
Workstream discussion – It was proposed that collection of case studies of deployment of liquid cooled solutions would be a logical first step.  All ACF participants are encouraged to provide a technical summary case study highlighting how solutions have been deployed in existing data center facilities.  It is not desired to share confidential customer information in this process, but simply providing physical parameters should be achievable without risk. 
Workstreams identified at Kick-off
FWS Requirements (ACS, Liquid)
• Guidance and specifications aligning facility cooling solution in support of liquid cooled IT technologies over the life of a data center [design, build, install, commission, operation].
• Connections – guidance and specifications connecting liquid cooled IT to facility pipe systems
Case Study library 
• Showcase of successful deployments of liquid distribution over the life of a data center
Reference Design Development
• Example deployment strategies that can easily be modified to support a spectrum of liquid cooling solutions.
Next Steps
- ACF participation inventory  - in progress https://docs.google.com/spreadsheets/d/1xTNRqwHnNy75Ca51IfBXhlt_6b4qW7NZByr2Jw0YC80/edit?usp=sharing
- ACS Case Study Collection – in progress
o Case Study input form https://docs.google.com/spreadsheets/d/1F2R8w9Qn73JoXhlg8AvUYJE9lldJdnfWqgS2J4M_aEA/edit#gid=1255462178
o ACS Pipe Design Request – part of case study collection
- Workstream breakout, timeline
- Co-Leader – in progress
- Recruitment – on-going outreach to OCP community and beyond
Please note that all contributions to OpenCompute may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see OpenCompute:Copyrights for details). Do not submit copyrighted work without permission!
Cancel Editing help (opens in new window)