==Welcome==
==Welcome==


:Welcome to the OCP '''Advanced Cooling Facility (ACF)''' '''Incubation Subproject'''.
:Welcome to the OCP '''Advanced Cooling Facilities (ACF)''' '''Incubation Subproject'''.


:This Project is open to the public and we welcome all those who would like to be involved.
:This Project is open to the public and we welcome all those who would like to be involved.
Line 14: Line 14:
===Project Leadership===
===Project Leadership===


==== Subproject Lead ====
==== Sub-project Leads ====
:- [mailto:don.mitchell@ocproject.net Don Mitchell] (Victaulic)
:- [mailto:don.mitchell@ocproject.net Don Mitchell] (Victaulic), [mailto:john.menoche@ocproject.net John Menoche] (Vertiv)


===Meetings===
===Meetings===


This project meets every 2 weeks; starting on Aug 4th, 2020.
This project currently meets every Tuesday at 1100 ET


Call-in info and source of truth @ http://opencompute.org/projects/projects-calendar/ (Time zone shown: Eastern Time) If there is ever a conflict between calendar invites, the OCP Project Calendar info on the website prevails.
Call-in info and source of truth @ http://opencompute.org/projects/projects-calendar/ (Time zone shown: Eastern Time) <br> If there is ever a conflict between calendar invites, the OCP Project Calendar info on the website prevails. This call is open to the public. <br>


This call is open to the public. Tentative Call info:


Please join my meeting from your computer, tablet or smartphone.
'''Tentative Call info:'''
 
Please join the  meeting from your computer, tablet or smartphone.
https://global.gotomeeting.com/join/948388005
https://global.gotomeeting.com/join/948388005


Line 32: Line 33:
United States: +1 (571) 317-3116
United States: +1 (571) 317-3116


Access Code: 948-388-005
'''Access Code: 948-388-005''' <br>
For alternate numbers and/or if you are new to GoToMeeting? Get the app now and be ready when your first meeting starts:
 
https://global.gotomeeting.com/install/948388005
 
'''For alternate numbers and/or if you are new to GoToMeeting?''' <br> Get the app now and be ready when your first meeting starts:
https://global.gotomeeting.com/install/948388005.
 


If there is a cancellation, we will try our best to cancel >24hrs before the meeting by the calendars above.
If there is a cancellation, we will try our best to cancel >24hrs before the meeting by the calendars above.
Line 43: Line 47:
:- [https://docs.google.com/presentation/d/1r6Z6-Sa10J9DVoxilhRhdGGmBUV0F7Gbzd2Udp-f_bs/edit?usp=sharing ACF Overview]
:- [https://docs.google.com/presentation/d/1r6Z6-Sa10J9DVoxilhRhdGGmBUV0F7Gbzd2Udp-f_bs/edit?usp=sharing ACF Overview]
:- [https://drive.google.com/file/d/1xhzqALSL-z7N5RADNMGwzZn8AQNEBhLp/view?usp=sharing ACF Presentation to OCP IC]
:- [https://drive.google.com/file/d/1xhzqALSL-z7N5RADNMGwzZn8AQNEBhLp/view?usp=sharing ACF Presentation to OCP IC]
:- [https://146a55aca6f00848c565-a7635525d40ac1c70300198708936b4e.ssl.cf1.rackcdn.com/files/dd77ae43befaecae3fea86520edcfb35d213f554.pdf DCF Consolidated Charter]
:- OCP Presentation Template - please contact [mailto:michael@opencompute.org Michael Schill] or [mailto:archna@opencompute.org Archna Haylock] for a copy


==Get Involved==
==Get Involved==
Line 52: Line 58:
==Regular Project Calls==
==Regular Project Calls==


:- '''Schedule:'''  
:- '''Schedule: Tuesdays @ 1100 ET'''


==Recordings from Past Calls==
==Recordings from Past Calls==
:- [https://www.youtube.com/watch?v=RNNCmatd7qk October 13th, 2020]
:- [https://www.youtube.com/watch?v=dDehr_v9D58 October 6th, 2020]
:- [https://www.youtube.com/watch?v=XdA7nJmefwc September 29th, 2020]
:- [https://www.youtube.com/watch?v=kHkTWs--oHQ September 15th, 2020]
:- [https://www.youtube.com/watch?v=4XcemT_2uNM September 8th, 2020]
:- [https://www.youtube.com/watch?v=pwPCsqXVJgU September 1st, 2020]
:- [https://www.youtube.com/watch?v=jgDw4eZ8haY August 25th, 2020]
:- [https://www.youtube.com/watch?v=gZW67QoP27k August 18th, 2020]
:- [https://www.youtube.com/watch?v=joG8p9CLpZs August 11th, 2020]
:- [https://www.youtube.com/watch?v=JYxEOZRdaxg August 4th, 2020]


==Notes from Past Calls==
Meeting Highlights, 8/11/20


==Notes from Past Calls==
- Review of Mission –
o Boundary of solution – ACF current boundary focus is solution development for connection of Advanced cooling solutions to Data Center faciltiies [and beyond].  Primarily water/glycol solutions connecting to facilities water system (FWS) or condenser water. 
 Action item – Develop a clearer technical description – John Bean, Julius Neudorfer leading this effort
- Problems to Solve – What are the key problems ACF is seeking to address
o Lack of standardization on facilities side of ACS solutions leads – unique solutions = unique problems.  OCP history has been to reduce challenges, cost by advancing standardization and simplification
o Perception issues preventing adoption of liquid cooling – complexity, cost, risk
o Adaptability/Scalability – ability to add/expand liquid cooling footprint requires planning
 Action item  Create tracking list of problems for ACF to address (Thank you Austin) https://docs.google.com/spreadsheets/d/1fnN755fuveLHEcqX_01EMsxoIwVi8iW4vccCES2fJ9A/edit?usp=sharing
Workstream discussion – It was proposed that collection of case studies of deployment of liquid cooled solutions would be a logical first step.  All ACF participants are encouraged to provide a technical summary case study highlighting how solutions have been deployed in existing data center facilities.  It is not desired to share confidential customer information in this process, but simply providing physical parameters should be achievable without risk. 
 
Workstreams identified at Kick-off
 
FWS Requirements (ACS, Liquid)
• Guidance and specifications aligning facility cooling solution in support of liquid cooled IT technologies over the life of a data center [design, build, install, commission, operation].
• Connections – guidance and specifications connecting liquid cooled IT to facility pipe systems
Case Study library 
• Showcase of successful deployments of liquid distribution over the life of a data center
Reference Design Development
• Example deployment strategies that can easily be modified to support a spectrum of liquid cooling solutions.
 
 
Next Steps
- ACF participation inventory  - in progress https://docs.google.com/spreadsheets/d/1xTNRqwHnNy75Ca51IfBXhlt_6b4qW7NZByr2Jw0YC80/edit?usp=sharing
- ACS Case Study Collection – in progress
o Case Study input form https://docs.google.com/spreadsheets/d/1F2R8w9Qn73JoXhlg8AvUYJE9lldJdnfWqgS2J4M_aEA/edit#gid=1255462178
 
o ACS Pipe Design Request – part of case study collection
- Workstream breakout, timeline
- Co-Leader – in progress
- Recruitment – on-going outreach to OCP community and beyond

Revision as of 18:09, 19 October 2020

OCP-advanced-cooling-facilities-color-horz-1x-v1-3b (1).png

Welcome

Welcome to the OCP Advanced Cooling Facilities (ACF) Incubation Subproject.
This Project is open to the public and we welcome all those who would like to be involved.
Mission: The Advanced Cooling Facilities Incubation Subproject mission is to develop best practices, create collaboration documents and common guidelines facilitating the integration of Advanced Cooling Solutions into Data Center Facilities.

Seeking to advance the acceptance, performance, reliability and minimize risk/cost of Advanced Cooling Solutions into any data center facility, but especially OCP Ready™ facilities.

Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP's Bylaws and IP Policy. This can be found on the OCP OCP Policies page. If you have any questions please contact OCP.

Project Leadership

Sub-project Leads

- Don Mitchell (Victaulic), John Menoche (Vertiv)

Meetings

This project currently meets every Tuesday at 1100 ET

Call-in info and source of truth @ http://opencompute.org/projects/projects-calendar/ (Time zone shown: Eastern Time)
If there is ever a conflict between calendar invites, the OCP Project Calendar info on the website prevails. This call is open to the public.


Tentative Call info:

Please join the meeting from your computer, tablet or smartphone. https://global.gotomeeting.com/join/948388005

You can also dial in using your phone. United States (Toll Free): 1 866 899 4679 United States: +1 (571) 317-3116

Access Code: 948-388-005


For alternate numbers and/or if you are new to GoToMeeting?
Get the app now and be ready when your first meeting starts: https://global.gotomeeting.com/install/948388005.


If there is a cancellation, we will try our best to cancel >24hrs before the meeting by the calendars above.

Meeting minutes is sent out in mailing list and can be found at [XXX]

Documents

- ACF Overview
- ACF Presentation to OCP IC
- DCF Consolidated Charter
- OCP Presentation Template - please contact Michael Schill or Archna Haylock for a copy

Get Involved

- ACF Mailing List
- OCP DCF Website
- OCP Projects Calendar

Regular Project Calls

- Schedule: Tuesdays @ 1100 ET

Recordings from Past Calls

- October 13th, 2020
- October 6th, 2020
- September 29th, 2020
- September 15th, 2020
- September 8th, 2020
- September 1st, 2020
- August 25th, 2020
- August 18th, 2020
- August 11th, 2020
- August 4th, 2020

Notes from Past Calls

Meeting Highlights, 8/11/20

- Review of Mission – o Boundary of solution – ACF current boundary focus is solution development for connection of Advanced cooling solutions to Data Center faciltiies [and beyond]. Primarily water/glycol solutions connecting to facilities water system (FWS) or condenser water.  Action item – Develop a clearer technical description – John Bean, Julius Neudorfer leading this effort - Problems to Solve – What are the key problems ACF is seeking to address o Lack of standardization on facilities side of ACS solutions leads – unique solutions = unique problems. OCP history has been to reduce challenges, cost by advancing standardization and simplification o Perception issues preventing adoption of liquid cooling – complexity, cost, risk o Adaptability/Scalability – ability to add/expand liquid cooling footprint requires planning  Action item Create tracking list of problems for ACF to address (Thank you Austin) https://docs.google.com/spreadsheets/d/1fnN755fuveLHEcqX_01EMsxoIwVi8iW4vccCES2fJ9A/edit?usp=sharing Workstream discussion – It was proposed that collection of case studies of deployment of liquid cooled solutions would be a logical first step. All ACF participants are encouraged to provide a technical summary case study highlighting how solutions have been deployed in existing data center facilities. It is not desired to share confidential customer information in this process, but simply providing physical parameters should be achievable without risk.

Workstreams identified at Kick-off

FWS Requirements (ACS, Liquid) • Guidance and specifications aligning facility cooling solution in support of liquid cooled IT technologies over the life of a data center [design, build, install, commission, operation]. • Connections – guidance and specifications connecting liquid cooled IT to facility pipe systems Case Study library • Showcase of successful deployments of liquid distribution over the life of a data center Reference Design Development • Example deployment strategies that can easily be modified to support a spectrum of liquid cooling solutions.


Next Steps - ACF participation inventory - in progress https://docs.google.com/spreadsheets/d/1xTNRqwHnNy75Ca51IfBXhlt_6b4qW7NZByr2Jw0YC80/edit?usp=sharing - ACS Case Study Collection – in progress o Case Study input form https://docs.google.com/spreadsheets/d/1F2R8w9Qn73JoXhlg8AvUYJE9lldJdnfWqgS2J4M_aEA/edit#gid=1255462178

o ACS Pipe Design Request – part of case study collection - Workstream breakout, timeline - Co-Leader – in progress - Recruitment – on-going outreach to OCP community and beyond