Rack & Power: Difference between revisions
Jump to navigation
Jump to search
(23 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
==WELCOME== | ==WELCOME== | ||
:Welcome to the OCP | :Welcome to the OCP Rack and Power Project. | ||
Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP's Bylaws and IP Policy. This can be found on the [[http://www.opencompute.org/participate/legal-documents/ Legal Docs]] page. If you have any questions please contact OCP. | |||
:This project if focused on optimizing all of the infrastructure that IT gear uses for very large scale deployments. | :This project if focused on optimizing all of the infrastructure that IT gear uses for very large scale deployments. | ||
Line 8: | Line 11: | ||
:::-Shelves and adapters | :::-Shelves and adapters | ||
:::-Cable management and gear interconnects | :::-Cable management and gear interconnects | ||
:: Stable Power delivery | :: Stable Power delivery at the Rack level | ||
:::-power distribution system | :::-power distribution system | ||
:::-battery back-up | :::-battery back-up | ||
Line 20: | Line 23: | ||
::-extracting value from components with different lifetimes | ::-extracting value from components with different lifetimes | ||
Link to the | Link to the Rack & Power Project Charter [http://files.opencompute.org/oc/public.php?service=files&t=b695eb9695aea8e6877a7fa0a5f39714 here] | ||
==Get Involved== | ==Get Involved== | ||
Line 33: | Line 36: | ||
::or a workshop: | ::or a workshop: | ||
:This project also meets at OCP Engineering Workshop Sessions as needed [http:// | :This project also meets at OCP Engineering Workshop Sessions as needed. [http://opencompute.org/projects/projects-calendar/ Please check out the Engineering Workshop Calendar] to find out how to join. | ||
===How to get in touch with OCP: Communication Paths=== | ===How to get in touch with OCP: Communication Paths=== | ||
Email one of the Rack & Power Project leads: | |||
[mailto:Steve.mills@ocproject.net Steve Mills] | |||
or | |||
[mailto:Brian.Obernesser@OCProject.net Brian Obernesser] | |||
Join the "Opencompute-openrack" mailing list [http://lists.opencompute.org/mailman/listinfo here:] | |||
Website - http://www.opencompute.org/projects/rack-and-power/ | |||
==Specifications and Design files== | ==Specifications and Design files== | ||
:The community involved in the | :The community involved in the Rack & Power Project has created several standards and specifications to help with developing new products. | ||
:All of the files are available for [http://www.opencompute.org/wiki/Open_Rack/SpecsAndDesigns '''<<DOWNLOAD>>'''.] | :All of the files are available for [http://www.opencompute.org/wiki/Open_Rack/SpecsAndDesigns '''<<DOWNLOAD>>'''.] | ||
: | : | ||
==Presentations from | ==Presentations from Rack & Power Meetings== | ||
=== | === CALL - FEB2018=== | ||
::[http://files.opencompute.org/oc/public.php?service=files&t=20da63b024495b15e9e5dbb8ac178c81 Multi-Vendor Interop - Artesyn] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=e9cb6abddfaa03ce9fbc09d509a25f16 Indicator Specification - Facebook] | |||
=== CALL - FEB2017=== | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=c82edd15b50c7e2c28e7f9bfb3876eb0 Proposed Power Changes to Open Rack 2.0 specification] | |||
===Dallas Engineering Workshop - SEP2017=== | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=b7da0c25a79720c4dbbe5f9d7726b43d OCP DALLAS Agenda - OCP] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=7b254ff7edba4b82551a339965b84944 Open Compute Busbar Standardization - Rittal] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=25e7d478d47c61b316602deefb47630f OCP Busbar Proposal - Amphenol] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=647808c9af8215e337eb55a5c69f8dc0 48V BarKlip IT Gear Connector - Amphenol] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=5f2a786c07d9dd707092ec856da55c59 Three Phase 380-480VAC Power Shelf Proposal V0.4 - GE] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=999db254e0f1c2b57786f43767e418cc Open Rack Specification Changes Proposal - DELTA] | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=64153f3a4b48ef9f639aef8c4dd51993 Overview of FLATPACK in Open Rack V2.0 - GOOGLE] | |||
===Santa Clara Summit - MAR 2017=== | |||
::[http://www.opencompute.org/wiki/Summit/US17#OpenRack_.2848v.29_and_Data_Center.29 Link to all Presentations] | |||
===UNH Engineering Workshop - AUG 2016=== | |||
::[http://files.opencompute.org/oc/public.php?service=files&t=cf80ec91104554a01b3227983f33a89c Google/FB Open Rack Standard V2.0 Overview] | ::[http://files.opencompute.org/oc/public.php?service=files&t=cf80ec91104554a01b3227983f33a89c Google/FB Open Rack Standard V2.0 Overview] | ||
===San Jose Summit - MAR 2016=== | ===San Jose Summit - MAR 2016=== | ||
Line 65: | Line 87: | ||
::[http://files.opencompute.org/oc/public.php?service=files&t=388449ed71aab129cf6d761e10f5d009 FACEBOOK Introduction to Facebook Open Rack V2] | ::[http://files.opencompute.org/oc/public.php?service=files&t=388449ed71aab129cf6d761e10f5d009 FACEBOOK Introduction to Facebook Open Rack V2] | ||
===Boston | ===Boston Engineering Workshop - OCT 2015=== | ||
::[http://files.opencompute.org/oc/public.php?service=files&t=c5be0630814912f394268f033327b23c INTEL Proposal for Open Rack Management Backplane Connection] | ::[http://files.opencompute.org/oc/public.php?service=files&t=c5be0630814912f394268f033327b23c INTEL Proposal for Open Rack Management Backplane Connection] | ||
::::[http://files.opencompute.org/oc/public.php?service=files&t=e42b45b07c421f90a79fd1da1636a98f INTEL UPDATE for Open Rack Management Backplane Connection] | ::::[http://files.opencompute.org/oc/public.php?service=files&t=e42b45b07c421f90a79fd1da1636a98f INTEL UPDATE for Open Rack Management Backplane Connection] | ||
Line 89: | Line 111: | ||
::[http://files.opencompute.org/oc/public.php?service=files&t=ec78a87847e38cbc86fb0663567057fb Fidelity Open Bridge Rack V1.0] | ::[http://files.opencompute.org/oc/public.php?service=files&t=ec78a87847e38cbc86fb0663567057fb Fidelity Open Bridge Rack V1.0] | ||
===San Jose Engineering | ===San Jose Engineering Workshop - Aug 2013=== | ||
::[http://files.opencompute.org/oc/public.php?service=files&t=f9902fdcee869909e6c8982584ad3bda Facebook Update on Open Rack V1] | ::[http://files.opencompute.org/oc/public.php?service=files&t=f9902fdcee869909e6c8982584ad3bda Facebook Update on Open Rack V1] | ||
===MIT Engineering | ===MIT Engineering Workshop - May 2013=== | ||
:: [http://files.opencompute.org/oc/public.php?service=files&t=b271071e459311c1be57a28640eaa7c1 Facebook Update on Open Rack V1] | :: [http://files.opencompute.org/oc/public.php?service=files&t=b271071e459311c1be57a28640eaa7c1 Facebook Update on Open Rack V1] |
Revision as of 17:34, 8 February 2018
WELCOME
- Welcome to the OCP Rack and Power Project.
Disclaimer: Please do not submit any confidential information to the Project Community. All presentation materials, proposals, meeting minutes and/or supporting documents are published by OCP and are open to the public in accordance to OCP's Bylaws and IP Policy. This can be found on the [Legal Docs] page. If you have any questions please contact OCP.
- This project if focused on optimizing all of the infrastructure that IT gear uses for very large scale deployments.
- This includes items like:
- Physical support structures
- -Racks
- -Shelves and adapters
- -Cable management and gear interconnects
- Stable Power delivery at the Rack level
- -power distribution system
- -battery back-up
- -power conversion
- Physical support structures
- This project is focused on solving problems for large scale deployment like:
- -fast deployment of resources to the data center
- -efficient upgrade cycles
- -simple physical and thermal interfaces for the data center
- -quickly identifying and servicing of failed components
- -extracting value from components with different lifetimes
Link to the Rack & Power Project Charter here
Get Involved
- This project is open to the public and we are interested in getting the community involved to make things better.
Events
- Join us at a meeting:
- This project meets annually at the OCP Summit events. More information on these events can be found on the OCP events page
- or a workshop:
- This project also meets at OCP Engineering Workshop Sessions as needed. Please check out the Engineering Workshop Calendar to find out how to join.
How to get in touch with OCP: Communication Paths
Email one of the Rack & Power Project leads:
or
Join the "Opencompute-openrack" mailing list here:
Website - http://www.opencompute.org/projects/rack-and-power/
Specifications and Design files
- The community involved in the Rack & Power Project has created several standards and specifications to help with developing new products.
- All of the files are available for <<DOWNLOAD>>.
Presentations from Rack & Power Meetings
CALL - FEB2018
CALL - FEB2017