Data Center Electrical

One component of the Open Compute data center design is a high-efficiency electrical system. Facebook’s Prineville, Oregon, location is the first implementation of these elements in a data center. The facility utilizes an electrical system with a 48VDC UPS system integrated with a 277VAC server power supply.